Transportation 3775 results

TRAFFIC ALERT: West Seattle Bridge lane closures tonight, SDOT says

June 28, 2023 8:29 pm
|    Comments Off on TRAFFIC ALERT: West Seattle Bridge lane closures tonight, SDOT says
 |   Transportation | West Seattle news | West Seattle traffic alerts

Those lane closures that were supposed to happen last night for West Seattle Bridge maintenance work didn’t happen after all, SDOT says, due to crew availability. So all the work is supposed to be done tonight. It’s scheduled to start as early as 9 pm and be completed no later than 5 am, with one lane open each way in the work zone

FOLLOWUP: SDOT hits the brakes on West Marginal medians

(Map of where SDOT was considering medians and a raised crossing)

Three weeks ago, we reported that SDOT was proposing landscaped medians in a stretch of West Marginal Way SW and asking for feedback. This afternoon, they say the idea of medians and a raised crossing has been “paused” as a result of what they heard. Here’s the announcement:

After gathering initial feedback on Phase 2 of the West Marginal Way SW Safety Corridor Improvements project, we have decided to pause on moving forward with the proposed median islands. We have decided to wait until after we have completed a post-project evaluation on Phase 1 of the project, which included installing a protected bike lane (PBL) and pavement markings and signs at the Duwamish Trail crossings, to determine what next steps are needed.

We have determined that is important to highlight the trail crossing across SW Front Street (near the Highland Park Way SW intersection) to increase visibility and safety, but we heard concerns about how a raised trail crossing may impact freight movement. Therefore, we are planning to look at other options, like pavement markings or green paint, to delineate the Duwamish Trail.

Next steps:

· Design a non-raised option for the Duwamish Trail crossing on West Marginal Way SW at SW Front St.

· Conduct a project evaluation of the PBL and Duwamish Trail crossing improvements with input from West Marginal Way SW stakeholders, including local businesses, trail and bike lane users, and the freight community.

· Collaborate with stakeholders to determine next steps based on the data findings.

We appreciate all the feedback we have received and will continue to seek input and share information along the way.

SDOT downsizing High Point Healthy Street

Back in April 2020, SDOT announced West Seattle’s first “Stay Healthy Street,” in High Point and vicinity. Now it’s planning to downsize. Here’s the announcement sent this afternoon, with word of a chance to talk with SDOT about it next week:

Over the last year we’ve been doing additional reviews and updating our Healthy Streets across Seattle based on community use trends and public feedback. For the High Point Healthy Street, we plan to remove the Healthy Street designation for some of the route while making another section permanent.

Permanent: Segment A – on 34th Ave SW, between SW Holden St and SW Graham St – is proposed to become a permanent Healthy Street. We plan to install permanent signage with a concrete block base and new painted curb space around it at each intersection. There is an option to replace the concrete base with a planter barrel if a neighbor wants to maintain it. Our Healthy Streets webpage has more information about adopting a planter.

Removal: We will be removing Segments B, C, and D and returning them back to a Neighborhood Greenway.

Segment B – SW Graham St, between 34th Ave SW and High Point Dr SW
Segment C – High Point Dr SW, between SW Graham St and Sylvan Way SW
Segment D – SW Holly St, between 34th Ave SW and 31 Ave SW
Please see the map (above) for your reference on the segments.

Join us June 27 for an Open House. We will have light refreshments to share and staff will be available to listen to your feedback regarding this update.

When: Tuesday, June 27, between 5:30 pm-7 pm

Where: High Point Neighborhood House, 6400 Sylvan Way SW, Room 207

They’re also asking your opinion on what type of permanent signage a Healthy Street should get – this SDOT photo shows the two “main options,” planter or signpost:

More info on the options is here. Meantime, we’ll be following up with SDOT Monday on whether other Healthy Streets are in for changes.

FOLLOWUP: Highland Park Way/Holden work closer to starting

Thanks to Kay for the photo and tip from Highland Park Way/Holden. She reported that no-parking signs had gone up for “Monday through mid-July,” and wondered if this meant the start of improvements at the intersection including the permanent signal replacing the temporary one that went up days after the West Seattle Bridge closed. Not yet, says SDOT spokesperson Ethan Bergerson:

Crews are planning to visit the intersection this month to verify where underground utilities are located so that we can confirm the exact location to install the new traffic signal poles. This will involve digging and then re-filling some small holes in the ground so that we can get a better look at what’s underneath the pavement.

We’re still working out the timeline for the installation of both the art and the signal poles. The biggest unknown right now is the supply chain timeline for signal poles, as the delivery date is outside of our control and it often takes a while to obtain this part. Once the signal poles arrive and are installed in the ground, the final step will be to work with Seattle City Light to hook up power so that the new traffic signal can be turned on.

The art to which he referred is this – a giant Steller’s Jay.

TRAFFIC ALERT: New stop signs at 44th/Findlay

4:47 PM: Thanks for the tip! That’s one of two new stop signs on 44th SW where it meets SW Findlay [map]. This is just west of California/Findlay, where SDOT installed a pedestrian-activated “half-signal” last October. The reader who emailed us about this earlier today said “yield” signs had been there previously, adding, “Not sure why the change – no recent increase in accidents or near-misses. Also, when traveling north on 44th, the new stop sign is obscured by a tree.” Same tree that’s in our photo, but the sign only comes into view when you arrive right up to it. We have a question out to SDOT about the rationale for the installation.

6:50 PM: SDOT spokesperson Ethan Bergerson responded, “This was a standalone project. The new stop sign is intended to enhance safety and provide clarity for people traveling through this intersection.”

Medians on West Marginal Way? City requesting feedback

SDOT is looking for feedback on a new proposal for part of West Marginal Way SW: landscaped medians:

We are seeking input on proposed landscaped median islands and a raised crosswalk. We are looking to understand driveway operations that would inform the median island size and feasibility.

Here’s the notice with information on proposed locations and how to comment. The deadline is June 20. SDOT spokesperson Ethan Bergerson also says they’re planning to evaluate the recently installed protected bike lane and “other safety elements” this summer.

TRAFFIC ALERT: New all-way stop near Westwood Village

Thanks for all the tips! Multiple emails alerted us to the new all-way stop configuration for 25th/Trenton, with marked crosswalks, on the northeast edge of Westwood Village. We asked SDOT about it; their reply: “This is a new all-way stop. The goal is to improve safety for everyone but especially pedestrians. There are a relatively large number of pedestrians crossing, including high school and middle school students. The new stop signs will also help transit make the left turn from Trenton to 25th.” It’s been five years since pathway improvements were built just north of the intersection.

2 key light-rail dates pushed back, Sound Transit tells West Seattle Transportation Coalition

(Sound Transit rendering, possible routing at Genesee looking east toward Avalon)

By Tracy Record
West Seattle Blog editor

Two dates of note on the Sound Transit light-rail extension timeline have been pushed back, ST told the West Seattle Transportation Coalition tonight.

One is the date ST will release the final Environmental Impact Statement for the West Seattle extension, which has to happen before the ST board finalizes the routing and station locations.

The other is the date the Ballard extension is projected to open – important for West Seattle because light rail from here won’t go all the way downtown (and beyond) until then; riders from West Seattle will have to transfer in SODO.

ST’s Leda Chahim and Jason Hampton provided the updates – no slide deck, so we don’t have visual highlights. Chahim first spotlighted the split between timelines for the West Seattle and Ballard extensions, since various factors led to the West Seattle “preferred alternative” being identified first, rather than the two extensions’ planning processes rolling along in parallel. Then Chahim said they’re not expecting to publish the final EIS for West Seattle until next year – and not early in the year, either; she said it would be after the first quarter. The most-recent timeline had been “late 2023,” which is still on the ST project website tonight, though Chahim said some updates would appear there soon.

She also said the final EIS will incorporate the “further studies” items – they’ll all be fully analyzed. Otherwise, they’re “still working on details’ but expect community engagement “this fall” for the stations and design concepts. Before then, they’ll be out at fairs, festivals, and the Farmers’ Market, to get reacquainted with the community.

WSTC’s Deb Barker asked for more about the status of “refinements” (aka the “further studies” items). Hampton took on that reply. He recapped what’s been studied – potential access improvements for the Delridge station and shifting a station entrance for The Junction. Chahim said the ongoing project website will be updated in the next few days. So with Ballard on a different timeline, what will that mean for the gap between trains from West Seattle going to SODO and going beyond? The additional work on Ballard has taken almost two years so that extension is now not expected to open until 2039 – which means a seven-year gap, previously five years (Chahim said 2032 is still the projected date for West Seattle). West Seattle RapidRide routes to downtown will continue for all those years, Hampton said.

Barker wondered what ST is doing to educate candidates, considering that this fall’s local elections will bring lots of changes (for example, two Seattle ST board members are not running for re-election, King County Councilmember Joe McDermott of West Seattle and City Council President Debora Juarez of North Seattle). Chahim didn’t know of anything in particular.

WSTC chair Michael Taylor-Judd suggested that ST needs to think about incorporating commercial space at stations, considering the “much-loved” neighborhood businesses that are likely to be displaced. He talked about how the supportive-housing Cottage Grove Commons building included space for the nonprofit Delridge Grocery Co-op, which has taken a while to really blossom but is finally getting there.

The Sound Transit updates followed an appearance by Metro reps to discuss one specific service:

TRAILHEAD DIRECT: This is a seasonal service for taking transit to a faraway hike! Ryan Miller from Metro talked about the program, which started with a pilot in 2017, then expanded to connect with Seattle light rail in 2018 and to serve destinations that people were asking about. They “started the program to mitigate parking access” but learned that the program really was about equitable access to outdoor destinations. That led to a new route from South King County in 2019. The pandemic led to a time of re-evaluation; they brought back two popular routes, from Issaquah and from Capitol Hill, in 2021. That year, though, they also were affected by the operator shortages that have plagued the entire system. So now they’re focusing on the route from Capitol Hill, and “that’s where we’re at for this season,” said Miller.

In Q&A – what’s the cost? Same as other transit – no special fare. (That also means free for 18 and under, interjected Metro’s Al Sanders.) And the buses do have bicycle racks. In response to another question, Miller said the lessons they’ve learned from Trailhead Direct have helped them when planning service restructuring, to include parks and other destinations. WSTC’s Barker pointed out that Alki service is spotty since Route 37 is long suspended; Miller noted 50, 773, and 775 still run. What types of coaches does Trailhead Direct use? asked WSTC’s Kate Wells. They tend to be a “little smaller” than the standard Metro coach, Miller said. The drivers are with Hopelink, so they don’t come from the pool handling general Metro service.

BOARD ELECTIONS: Three members were re-elected; no one was nominated for three vacant positions, so if you’re interested, contact WSTC and get involved.

NEXT MEETINGS: WSTC remains on an every-other-month schedule – so the rest of the year will include July 27th, September 28th, November 16th (tentative), 6:30 pm. They’re still mulling locations in hopes of holding hybrid meetings (in-person and online).

WEEKEND ALERTS: Road, sidewalk work in West Seattle

May 19, 2023 6:00 pm
|    Comments Off on WEEKEND ALERTS: Road, sidewalk work in West Seattle
 |   Transportation | West Seattle news | West Seattle traffic alerts

Just received these notices from SDOT:

-This weekend, SDOT will be paving Myers Way S between Olson Place SW and 2nd Ave SW. The road will be closed to all vehicles except transit from 7 a.m. Saturday, May 20 to 7 p.m. on Sunday, May 21.

-On Saturday, May 20, SDOT will be performing sidewalk construction at Chelan Ave SW and W Marginal Way SW to build a new curb ramp.

STATE FERRY FARES: They have to go up. Survey asks you – how?

The Legislature says Washington State Ferries needs to generate a certain amount of revenue. Now the Washington State Transportation Commission, which sets fares, has to decide how to raise fares to meet the requirement The WSTC has opened a survey with questions for you; you can answer them here. Its results will be used to shape a fare proposal that’ll be made public next month.

FERRY ALERT: Fauntleroy-Vashon-Southworth down to one boat tonight

From Washington State Ferries:

Due to lack of crew, the final sailing for the #2 Cathlamet will be the 5:55 p.m. Fauntleroy to Vashon departure. The #1 Kittitas will remain on the #1 boat schedule for the remainder of the night.

If that changes, WSF will update here.

FOLLOWUP: Here’s the latest on West Seattle low-bridge repairs/maintenance

(SDOT photo, January)

Four months have passed since a leaky cylinder was removed from the West Seattle low bridge (officially known as the Spokane Street Swing Bridge). Soon after that, the bridge reopened to surface traffic after a three-week closure. But the bridge has been running without that cylinder ever since, and that means it takes longer to open and close for maritime traffic; a post-reopening briefing noted that other cylinders would be removed for refurbishment one at a time. So what’s happened since then? We asked SDOT, whose spokesperson Ethan Bergerson replied:

We’re continuing to work on overhauling the damaged cylinder that was removed in January. This involves dismantling the cylinder and conducting a forensic evaluation of each of the parts to determine if there are any modifications that we can consider to improve the life of the cylinder. It will likely be a few months before we complete this overhaul and reinstall this cylinder. When we reinstall the repaired cylinder, we will also remove a cylinder which is currently in service so that we can complete an overhaul of that one as well.

Over the next five days, some other work is planned that will affect maritime traffic (but not vehicles/pedestrians/bicyclists) – here’s the SDOT advisory on that:

Between 1 AM Saturday, May 13 and 1 AM Wednesday, May 17, maritime vessels will have limited access under the Spokane St Swing Bridge to navigate the Duwamish Waterway. We do not expect impacts to people driving, walking, or biking.

During this time, only the east span (side) of the bridge will swing open and closed for maritime vessels on the Duwamish Waterway. We’ve been communicating with the U.S. Coast Guard about this work, which will limit when some larger vessels can pass through.

This work is necessary for us to perform service and inspection on one of the bridge’s hydraulic pumps. The bridge has three hydraulic pump units at each pier to push hydraulic fluid to the bridge’s cylinders, allowing the cylinders to lift and swing the bridge open and closed.

We’re completing maintenance on all the hydraulic pump units for both piers in 2023. We’re starting with the west side of the bridge and will return later in 2023 to work on the east side.

This city webpage chronicles the ongoing work.

TRANSIT: Metro plans to officially suspend Admiral’s Route 55 starting this fall

“We’re in the enviable position where people want more transit. But – we’re unable to give it to them.”

So said Metro‘s general manager Michelle Allison toward the end of a just-concluded media briefing with early warning of route suspensions planned for the next twice-yearly “service change,” on September 2nd.

One West Seattle route is on the list – Route 55, which is scheduled for only six trips a day now, five in the morning, one in the afternoon (its schedule was officially reduced last September). “Scheduled” is the key word here – as riders know, Metro has been frequently canceling trips. Allison said the point of suspending more routes – 32 of the current 156 system-wide – is to improve reliability so that by the time they get to September, “the schedule IS the service,” not just an aspirational plan.

Here’s the full list of what they’re planning now for a September 2nd change. And needless to say, currently suspended routes aren’t in the plan for restoration – that would include long-suspended West Seattle Route 37. We asked how they can be certain that this round of suspensions will put them on the road to reliability. Allison, who took over as Metro GM earlier this year, said they believe they’ve done enough analysis and “daylighting” of personnel and supply-chain reality, that they have an accurate picture of what they can reliably deliver. She added that what’s on the schedule starting September 2nd is roughly equal to what, with ongoing trip cancellations, they’re actually delivering now.

Again, the changes announced today – and other forthcoming adjustments – won’t officially be part of the schedule as of September 2nd – so until then, Route 55 is still, technically, operational.

TRAFFIC ALERT: Watch for street-painting crews

TUESDAY REPORT: Seen in The Junction today – SDOT crews repainting road markings. Warmer weather this time of year tends to launch a lot of work like this that couldn’t be done during the cold, rainy season, so be extra watchful, and be aware you may need a few extra minutes to get where you’re going.

ADDED WEDNESDAY: We asked SDOT for some context. Spokesperson Ethan Bergerson replied:

Each year, we repaint over 1,500 crosswalks across Seattle to keep markings bright and visible. This work requires dry weather, and so as you guessed the spring and summer is re-painting season. This is made possible thanks to funding from the voter-approved Levy to Move Seattle.

This year, we’re repainting about 160 crosswalks in Seattle City Council District 1. Our signs and markings crew have already completed roughly 125 of these crosswalks, and have about 35 crosswalks left to paint.

FOLLOWUP: Spokane Street Viaduct repaving may happen sooner than previously expected

(SDOT camera image)

Discussions of the hole that shut down the state-owned ramp from the West Seattle Bridge to Highway 99 (reopening tomorrow) have swerved into concerns about the condition of the city-owned Spokane Street Viaduct. (That’s the formal name for the east half of the West Seattle Bridge, from Highway 99 to I-5.) Those concerns also came up during the 2 1/2-year repair closure of the west half of the West Seattle Bridge. The eastbound Spokane Street Viaduct, not part of the repair project, did close for work including pothole repairs multiple times during those 2 1/2 years, and SDOT did deck scanning for a more extensive assessment. Then in July of last year, the city announced it had received a $5 million federal grant to resurface the entire eastbound side of the SSV. At the time of that announcement, SDOT told us that resurfacing would happen in “the next few years.” So we asked last week where that plan stands, and got this answer today from SDOT spokesperson Ethan Bergerson with a somewhat speedier timeline: “We are currently in the design phase of this project, and anticipate starting construction as soon as next year. The construction work will address the frequent overlay issues that we have been encountering on the eastbound lanes of the Spokane St Viaduct.” The eastbound lanes are on the original 1940s-built SSV structure; the westbound side was built a decade-plus ago to widen it

RAMP REPAIR UPDATE: Reopening by Tuesday morning, WSDOT says

(WSB photo, Wednesday)

2:52 PM: Six days after that hole forced the Washington State Department of Transportation to close its ramp connecting the eastbound West Seattle Bridge to northbound State Highway 99, here’s the latest:

As reported over the weekend, crews poured concrete on Saturday, and now it’s curing. WSDOT spokesperson James Poling explained why the schedule remains the same as announced last week (which would reopen the ramp by this Saturday): “The concrete curing process requires our offsite materials lab breaking test concrete cylinders from the pour at certain time benchmarks (24 hours after pour, 48 hours after pour, etc.). Once a test cylinder reaches a strength to safely reopen traffic, the bridge ramp will reopen. The timetable remains the same at this time as our crews await a test cylinder to pass that strength benchmark.”

Meantime, since there was initially much public confusion over who’s accountable for the ramp, and some commenters said they had filed ramp-pothole reports with the city, we asked the Seattle Department of Transportation if they’d received such reports about the state-owned ramp and what happened to them. Spokesperson Ethan Bergerson replied, “When the public reports a pothole which is outside the city limits or not on SDOT’s right-of-way, it will be routed to the correct transportation agency. Over the past few months, we notified WSDOT of several public reports of potholes in this location.” We’ll follow up on that, as WSDOT had said previously they weren’t aware of the hole – at least at the magnitude that forced last Tuesday’s closure.

4:28 PM UPDATE: Just got another update – the ramp concrete “has cured more quickly” than expected, and the ramp will be open by 5 am tomorrow (Tuesday).

FOLLOWUP: Ramp repairs, day 4

(WSDOT photos)

The Washington State Department of Transportation says its crew made more progress today toward repairing and reopening the ramp between the West Seattle Bridge and northbound Highway 99. It’s been closed since Tuesday night, when a 5′ x 4′ hole in the 64-year-old ramp caused tire blowouts for at least five drivers. WSDOT’s latest update: “Today we’ve poured concrete. It usually takes a few days for this type of concrete to cure properly in order to safely reopen the ramp.”

We’ll find out on Monday if that’s altered the schedule – originally announced as 10 days, which would mean reopening by next Saturday. In the meantime, your options for getting to Highway 99 are the 1st Avenue South Bridge or via the 1st Avenue exit on the eastbound bridge, leading you into SODO, where you can get onto 99.

ROAD WORK AHEAD: Roxbury/Olson project starting soon

That map from SDOT shows where work is expected to start soon for pedestrian improvements at Roxbury/Olson [map], which have been in the works for at least three years. The city has sent notices to people in the area, but it’s a busy corridor, so many others who use it need to know too. From the SDOT advisory:

This work will include:

-A new pedestrian signal on the northwest side of the intersection
-Shifting the crosswalks across SW Roxbury St so they’re better aligned
-Curb bulbs that extend the sidewalk corners for people walking on the south side of the intersection
-Curb ramps for improved ADA (Americans with Disabilities Act) accessibility

Once work begins, it is expected to last six months, SDOT says, with work hours primarily 9 am-3 pm on weekdays. They’ll have flaggers to help with lane closures. Here’s the full construction notice.

FOLLOWUP: Ramp repairs, day 2

(WSB photos, noontime today)

When we went over today for another look under the damaged ramp to Highway 99, we arrived just as that crew was ascending to the ramp’s underside. It’s been two days now since a 5′ x 4′ hole in the ramp took out tires on at least five vehicles before WSDOT ordered it closed. It’s a state-owned structure, as is Highway 99, to which the ramp leads from an exit on the eastbound West Seattle Bridge. WSDOT spokesperson James Poling tells WSB that repairs remain on schedule – that’s the schedule announced yesterday, 10 days, which would mean the work is expected to be done by May 13th. He says the lift we photographed carries workers 38 feet up from ground to ramp. So what exactly is happening now? Poling replied, “Most of the concrete removal is now complete. The next repair step is building forms underneath the deck and sealing the space between the girder webs. This will take about 36-48 hours.”

As we reported yesterday, the ramp was built in 1959 and last inspected in August 2022. It remained open to traffic during the West Seattle Bridge’s two and a half-year closure, still accessible via a ramp from surface Spokane Street, except for a week-plus closure to repair a deck hole about 100 feet from this one.

P.S. We found more information about the ramp via this inventory map – including its official name, E-N Ramp, and confirmation that its inspection schedule is every two years

FOLLOWUP: Washington State Department of Transportation expects 99 ramp with ‘gaping hole’ to stay closed for 10 days

(WSB photos)

3:26 PM: The day after that “gaping hole” opened in the ramp from the eastbound West Seattle Bridge to northbound State Highway 99, the Washington State Department of Transportation, which owns the ramp, says it’s likely to stay closed at least 10 days. We first reported on the hole starting at 6:41 pm Tuesday evening, when police suddenly found themselves dealing with multiple drivers pulled over on 99 because the hole had punctured their tires. The ramp was closed a short time later, and WSDOT crews responded. Today they are working both on and beneath the ramp; we checked out the scene at ground level. One task there is to set up a debris-containment area:

That’s both for debris that already has fallen from the hole, measured at 5 feet by 4 feet, and anything more generated by assessment and repair work. It’s a hard-hat zone, emphasizes WSDOT spokesperson James Poling, who tells WSB that crews on the ramp have been checking other areas around this one today to ensure they’re stable, and so far haven’t found anything notable. We talked with Poling at the scene below the ramp at noontime (as well as twice by phone). He says the state built this ramp in 1959 (same year as completion of the now-demolished Alaskan Way Viaduct to which it connected). We’re awaiting answers from WSDOT to questions such as when it was last inspected and what the regular inspection schedule is, as well as whether they’d had reports about this hole before, as WSB commenters say they’ve seen it for weeks.

This hole is not in the same spot on the ramp as the one for which the ramp was closed for repairs last year, says Poling – it’s about 100 feet from that one. (Added: This February 2022 WSB story includes a slide with three images of that hole.) That brings up another clarification this ramp was NOT closed during the West Seattle Bridge’s 2 1/2-year-long repair closure – except for the repair work a year ago, it remained open to traffic, accessible via eastbound Spokane Street. Poling says that while they are still working on a timeline estimate, they are certain this is not going to be a West Seattle Bridge-magnitude length closure. He’s expecting to have another update and some answers for us later today, and we’ll update this story.

DETOURS: If you need to get to northbound 99, use the northbound 1st Avenue South Bridge, or the 1st Avenue South exit from the eastbound West Seattle Bridge/Spokane Street Viaduct, then head north and connect to NB 99 in SODO.

IF YOUR VEHICLE WAS DAMAGED: WSDOT provided this link for filing a claim.

4:30 PM UPDATE: Just talked again with WSDOT’s Poling. He says 10 days is now the official expected duration of the closure – no longer “at least” 10 days, just “10 days.” He says crews right now are preparing for the repairs by chipping away at “unsuitable” – failed – concrete around the hole, and from there “it’s a standard bridge-deck repair.” He says the ramp was last inspected in August of last year, and while he doesn’t know its regular inspection schedule, he says it’s at least every two years. Poling also says that WSDOT maintenance crews were not previously aware of this hole – he said an emergency closure would have resulted if they had been.

SAFETY ALERT: Wednesday is Bike/Walk/Roll To School Day

(WSB file photo from past Bike To School Day)

If you’re on the roads and/or sidewalks tomorrow (Wednesday, May 3rd), expect more multi-modal traffic heading to and from local schools. Genesee Hill Elementary parent Dave points out that it’s Bike/Walk/Roll To School Day and wanted us to share this reminder again: “Drivers, please keep an extra eye out for students biking and walking to school tomorrow, May 3rd. Students will be coming from all directions between 7:30-7:45 AM and arriving in the parking lot on Dakota St.” Any other schools participating? Let us know (or post a comment) – thank you!

READER REPORT: California/Genesee crosswalk light broken again

Last week we heard from Taylor about a malfunction with the flashing beacon signal for the crosswalk on California at Genesee. They reported it to SDOT, and it got fixed. But now we’ve heard from Jesse that it’s broken again: “Just a heads up, the pedestrian crossing signal at California and Genesee isn’t working. I’ve reported it to the city, but if people want to cross they should probably go a block either way to do so safely.” (Besides the Find It Fix It app, you can report transportation-related trouble via 206-684-ROAD or, after hours, 206-386-1218.)

FOLLOWUP: West Marginal Way SW protected bike lane work ‘nearly complete’

After last weekend’s work, SDOT says it’s “nearly” done installing the 2-way protected bike lane along an almost-half-mile stretch of West Marginal Way SW north of the Duwamish Longhouse – jersey barriers are up and lane markings are painted. We drove alongside it this afternoon for a closer look:

Reminder signage is in place at driveways not only on the bike-lane side but also on the northbound side of West Marginal, where the pre-existing Duwamish Trail crosses. It’s been more than two years since SDOT proposed the bike lane, eventually deciding to hold off on installation until after the West Seattle Bridge reopened last September.